[2026-2-2 | Pre-Move-In Inspection Report] Checking Equipment and Furnishings and Testing Operation in Advance
Service Log

[2026-2-2 | Pre-Move-In Inspection Report] Checking Equipment and Furnishings and Testing Operation in Advance

Tplan

On February 2, 2026, before occupancy began, our staff visited the property to inspect its equipment and furnishings and check their operation.

We checked the operation of the front door, interior doors, and windows and tested plumbing fixtures in the kitchen, bathroom, and toilet areas. We also confirmed that major appliances and furniture were undamaged and ready for normal use.

We also inspected the walls, floors, waterproofing, and ventilation and addressed safety concerns in advance.

At the resident's request, we also helped install some smaller furniture and equipment so the home was ready for a comfortable move-in.

Tplan